CVE Catalog

CVE-2026-74731

HighCVSS 7.8
Published: Updated: Translated: NVD NIST

Exploitation Probability (EPSS)

Low risk
0.12%

2th percentile - higher than 2% of all known CVEs

Summary

In the Linux kernel, in sched_ext, when a sub-scheduler enable fails before scx_link_sched(), the cleanup still runs the full scx_sub_disable(), which can race with root disable and lead to use-after-free. The fix skips the cgroup ownership reset and task walk if the scheduler was never linked.

Risk Assessment

Risk of kernel crash or unpredictable scheduler behavior, potentially leading to system hang.

Recommendation

Apply a kernel update containing the fix that skips teardown for never-linked sub-schedulers.

Other vulnerabilities in Linux kernel

See all
Original NVD description (English source)

In the Linux kernel, the following vulnerability has been resolved: sched_ext: Skip sub-disable teardown for never-linked sub-schedulers A sub-scheduler enable can fail before scx_link_sched() links the sched into the hierarchy, e.g. when the parent is already being disabled, and cleanup still runs the full scx_sub_disable(). That is racy against root disable: drain_descendants() is the only ordering between a sub's disable-time task walk and root disable's all-task teardown, and an unlinked sub is invisible to it. Root's teardown can thus run between the never-linked sub's drain and its walk, exiting every task to no scheduler. The walk then trips the membership WARN and re-homes the exited tasks onto the dying hierarchy, a use-after-free. Skip the cgroup ownership reset and the task walk if @sch was never linked, indicated by the empty ->sibling as unlinking only happens later in the same function. The membership WARN remains valid: a linked sub is always waited on by an ancestor's drain.

Vulnerability data from NVD (NIST) · CISA KEV · EPSS